Project Summary
- Built a new second full bathroom with shower stall and custom claw-foot tub
- Completely gutted and remodeled original bathroom (with Jacuzzi)
- Moved a hallway
- Re-piped the whole house with copper
- Built a new master bedroom
- Relocated the furnace (closet and utilities)
- Completely upgraded the central air conditioning system, including attic ductwork
- Completely gutted and remodeled the kitchen with maple and oak cabinets
- Installed oak hardwood floors in LR and master bedroom
- Refurbished original oak hardwood floors in bedrooms
- Installed porcelain tile in bathrooms & kitchen & hall
- Upgraded all electric throughout house (wiring, receptacles, switches)
- Replaced all windows with new vinyl windows
- Added earthquake structural shear plywood to many outside and interior walls
- Installed automatic timer landscape lighting and automatic irrigation throughout the yard
- Installed hard pine doors and oak trim throughout house
- Installed cable and phone lines in all rooms
- Upgraded insulation throughout the house
- Built laundry area
- Installed stone veneer to outside entry and driveway walls
- Built new attic access with ladder